The site topography and design form of this leisure centre, with its unique combination of levels, curves and material interfaces provided multiple challenges. As a result, the Arupengineered project involved complex structures and material junctions associated with the pools and roof structures, while also meeting the quality standards for exposed structural elements. Clyde Mitchell of Stephenson Group reports.
top of page
bottom of page