This construction will be an office complex split over two buildings with a central car park area. Built within the graded footpaths & highways on two elevations there is a 2 storey basement dig. to the other two elevations in the same structure is above ground/suspended. An existing secant piled wall and capping beam needs temporary propping. Foundations, Drainage, Columns and Podiums. All three cores to be slipped and stairs to be stairform.
