This student accommodation project will see 4 blocks ranging between 4-5 floors and a retail block consisting of 4 floors all on 1.8 meter tall column stills for flood avoidance. Drainage, foundations and reinforced concrete frame to be completed by the end of November.
top of page
bottom of page